Mahenge Graphite

Type: Graphite

Country: Tanzania

Project Geotechnical Consultant to Black Rock Mining Limited and CPC Engineering for their proposed Dry Stacked Tailings Storage Facility (DSTSF).  Evaluation of FS data prepared by others and preparation of recommendations on dry stacking for the 32-year life of project.