Experience

Tailings Storage Facility (TSF) Specialist

Experience

  • Filter projects by commodity:

  • Filter projects by country:

  • Filter projects by climatic regime:

Commodity: Copper

DeGrussa Oxide Project Sandfire Resources NL.

Project Manager for evaluation and design of a heap leach facility and TSF (thickened tailings). Preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.


Commodity: Copper

DeGrussa Project Sandfire Resources NL

Evaluation of TSF options (expansion of the existing TSF, construction of new TSFs adjacent to the existing facility, dry stacking and in-pit tailings storage) for the new gold project and tailings retreatment. Preparation of concepts from start up through to closure, evaluation of options, production of a technical report and client liaison.


Commodity: Copper

Dominga Tailings Storage Facility

Review of the prefeasibility study design for the tailings storage facility using thickened tailings for the Dominga Project (magnetite / copper) as part of the ‘gap analyses prior to the Definitive Feasibility Study.


Commodity: Iron Ore

El Aouj Iron Ore Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Gold

Esaase Project for Keegan Resources Inc

Project Manager for evaluation of valley type TSF including preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.


Commodity: Gold

Evolution Mining Lake Cowal

Project reviewer for the Tailings Storage Facilities designed by others November 2016. Gaps in the design and operations identified and recommendations provided for improvements to the existing design by encapsulating these facilities with mine waste from pit cutbacks to form an integrated waste landform (IWL). The IWL was adopted and constructed in 2019/2020.


Commodity: Manganese

Exxaro Super Fines Project Tailings Storage Facility

Participation in the study and development of concept options for the design for the tailings storage facility using thickened tailings for the proposed HDPE lined Tailings Storage Facility.  Review of design criteria and design documents for the final option.


Commodity: Gold

Geita Gold Mine

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Gold

Gidgee

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.