Experience
Experience
Experience
Balama Graphite
Project Geotechnical Consultant to Twigg Mining and Exploration Limitada for their proposed conversion from thickened tailings to a Dry Stacked Tailings Storage Facility (DSTSF). Evaluation of data and preparation of the preliminary study leading to the PFS for dry stacking for the remaining 38-year life of project.
Country:
Mozambique, East Africa
Climatic:
Humid Savannah
Balama Graphite
Project Geotechnical Consultant to Syrah Resources for the bituminous lined Tailings Storage Facility (TSF), plant site foundations and roads. Evaluation of DFS data prepared by others and preparation of recommendations, process water, mine waste and TSF for thickened tailings for the initial 40-year life of project. In mid-2018 consideration of the change to dry stacked tailings commenced.
Country:
Mozambique, East Africa
Climatic:
Humid Savannah
Bannockburn Gold Mine
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Australia
Climatic:
Semi Arid
BC Iron Mardie Salt Project
High level advice for the geotechnical aspects of the Prefeasibility Study for the design of the evaporation pond, crystallisers and process plant.
Country:
Western Australia
Climatic:
Semi Arid
Big Bell
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Australia
Climatic:
Semi Arid
Bogosu Gold Project
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Ghana
Climatic:
Tropical
Brockman Iron Ore Project
Project Manager Brockman with responsibility for Fieldwork (costeans and testpits) for 46km of rail alignment. Organisation of laboratory testwork and preparation of reports.
Country:
Australia
Climatic:
Semi Arid
Bulong Nickel
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Australia
Climatic:
Semi Arid
Castle Hill Project for Phoenix Gold Limited
Project Manager for evaluation and design of a heap leach facility and IWL TSF (tailings storage facility within a waste dump) and geotechnical investigation of the plant site. Preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Country:
Australia
Climatic:
Semi Arid