Experience

Tailings Storage Facility (TSF) Specialist

Experience

  • Filter projects by commodity:

  • Filter projects by country:

  • Filter projects by climatic regime:

Commodity: Graphite

Chilalo Graphite (Tanzania)

Project Geotechnical Consultant to Evolution Energy Minerals Limited for their proposed Co-Mingled Tailings and Mine Waste. Evaluation of FS data prepared by others and preparation of recommendations on stacking for the project.

Country:
Australia

Climatic:
Semi Arid

Commodity: Graphite

Siviour Graphite Project

Project Geotechnical Consultant to Wave International for the DFS for the 0.85 to 1.625 Mt Graphite Project.  Evaluation of data and input to the DFS for 20-year life of project.

Country:
Australia

Climatic:
Semi Arid

Commodity: Graphite

Mahenge Graphite

Project Geotechnical Consultant to Black Rock Mining Limited and CPC Engineering for their proposed Dry Stacked Tailings Storage Facility (DSTSF).  Evaluation of FS data prepared by others and preparation of recommendations on dry stacking for the 32-year life of project. 

Country:
Tanzania

Climatic:
Tropical

Commodity: Graphite

Hexagon Resources Limited – McIntosh Project

Completion of the Pre-Feasibility Study for the Tailings Storage Facility for the McIntosh Project in the Kimberly Region of Western Australia. Evaluation of options for tailings storage for the maximum project life of 12.3 years for a bituminous lined tailings storage.

Country:
Australia

Climatic:
Humid Savannah

Commodity: Graphite

Balama Graphite

Project Geotechnical Consultant to Syrah Resources for the bituminous lined Tailings Storage Facility (TSF), plant site foundations and roads. Evaluation of DFS data prepared by others and preparation of recommendations, process water, mine waste and TSF for thickened tailings for the initial 40-year life of project. In mid-2018 consideration of the change to dry stacked tailings commenced.

Country:
Mozambique, East Africa

Climatic:
Humid Savannah

Commodity: Graphite

Balama Graphite

Project Geotechnical Consultant to Twigg Mining and Exploration Limitada for their proposed conversion from thickened tailings to a Dry Stacked Tailings Storage Facility (DSTSF). Evaluation of data and preparation of the preliminary study leading to the PFS for dry stacking for the remaining 38-year life of project.

Country:
Mozambique, East Africa

Climatic:
Humid Savannah