Project Geotechnical Consultant to Evolution Energy Minerals Limited for their proposed Co-Mingled Tailings and Mine Waste. Evaluation of FS data prepared by others and preparation of recommendations on stacking for the project.
Graphite
Experience
Tailings Storage Facility (TSF) Specialist
Experience
Commodity: Graphite
Siviour Graphite Project
Project Geotechnical Consultant to Wave International for the DFS for the 0.85 to 1.625 Mt Graphite Project. Evaluation of data and input to the DFS for 20-year life of project.
Country:
Australia
Climatic:
Semi Arid
Commodity: Graphite
Mahenge Graphite
Project Geotechnical Consultant to Black Rock Mining Limited and CPC Engineering for their proposed Dry Stacked Tailings Storage Facility (DSTSF). Evaluation of FS data prepared by others and preparation of recommendations on dry stacking for the 32-year life of project.
Country:
Tanzania
Climatic:
Tropical
Commodity: Graphite
Hexagon Resources Limited – McIntosh Project
Completion of the Pre-Feasibility Study for the Tailings Storage Facility for the McIntosh Project in the Kimberly Region of Western Australia. Evaluation of options for tailings storage for the maximum project life of 12.3 years for a bituminous lined tailings storage.
Country:
Australia
Climatic:
Humid Savannah
Commodity: Graphite
Balama Graphite
Project Geotechnical Consultant to Syrah Resources for the bituminous lined Tailings Storage Facility (TSF), plant site foundations and roads. Evaluation of DFS data prepared by others and preparation of recommendations, process water, mine waste and TSF for thickened tailings for the initial 40-year life of project. In mid-2018 consideration of the change to dry stacked tailings commenced.
Country:
Mozambique, East Africa
Climatic:
Humid Savannah
Commodity: Graphite
Balama Graphite
Project Geotechnical Consultant to Twigg Mining and Exploration Limitada for their proposed conversion from thickened tailings to a Dry Stacked Tailings Storage Facility (DSTSF). Evaluation of data and preparation of the preliminary study leading to the PFS for dry stacking for the remaining 38-year life of project.