Experience

Tailings Storage Facility (TSF) Specialist

Experience

  • Filter projects by commodity:

  • Filter projects by country:

  • Filter projects by climatic regime:

Commodity: Gold

Definitive Feasibility Study Sabodala Mine.

DFS for tailings storage facilities TSF1, TSF2, Sabodala In-Pit TSF as an alternative to TSF2, BIOX TSF (double HDPE-lined with underdrainage, leak detection between the liners and leak detection under the base liner).

Country:
Senegal

Climatic:
Humid Savannah

Commodity: Lithium

Goulamina Lithium

Project Geotechnical Consultant to Birimian Limited for the proposed Water Storage Dams/Water Storage Facilities (WSD/WSF), Tailings Storage Facility (TSF), plant site foundations. Execution of PFS study for the TSF for thickened (65% solids wet tailings stream and dry tailings stream) for the initial 40-year life of project followed by the DFS Study.

Country:
Mali

Climatic:
Humid Savannah

Commodity: Rare Earth

Peak Resources Ngualla Rare Earths Project

Project reviewer for the DFS Tailings Storage Facility designed by others. Gaps in the design identified and recommendations provided for improvements to the design.

Country:
Tanzania

Climatic:
Humid Savannah

Commodity: Lithium

Leo Lithium (formerly Mali Lithium) Goulamina Lithium

Project Geotechnical Consultant for revised Goulamina Project Tailings Storage Facility (TSF), for the proposed 80 to 200 Mt Project for thickened (50% solids wet tailings stream) for the initial 20-year life of project.

Country:
Mali

Climatic:
Humid Savannah

Commodity: Graphite

Hexagon Resources Limited – McIntosh Project

Completion of the Pre-Feasibility Study for the Tailings Storage Facility for the McIntosh Project in the Kimberly Region of Western Australia. Evaluation of options for tailings storage for the maximum project life of 12.3 years for a bituminous lined tailings storage.

Country:
Australia

Climatic:
Humid Savannah

Commodity: Gold

Geita Gold Mine

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Tanzania

Climatic:
Humid Savannah

Commodity: Gold

Tulawaka Mine

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Tanzania

Climatic:
Humid Savannah

Commodity: Iron Ore

Cockatoo Island Iron Ore Beneficiation Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Cockatoo Island

Climatic:
Humid Savannah

Commodity: Gold

Syama Tailings Storage Facilities

Project Manager for the OTSF and FTSF (oxide and flotation tailings) for Syama Project Mali. Site visit and evaluation of borrow area for tailings storage, data review, development of conceptual design and adjustments to the adjacent aerodrome design to accommodate the OTSF. Direction of design of the containment embankment using insitu materials supplemented with mine waste, evaluation reports, technical review and client liaison.

Country:
Mali

Climatic:
Humid Savannah

Commodity: Gold

TSF Strategy Study Sabodala Mine

Review of the life of mine (LOM) tailings storage facility strategy and preparation of the PFS Report for input to the Canadian NI 43-101 Stock Exchange Report.

Country:
Senegal

Climatic:
Humid Savannah