Land & Marine Geological Services Pty Ltd
(L&MGSPL)
Tailings Storage Facility (TSF) Specialist
Get to know us better
Get to know us better
Chris is Director and Principal Consultant (Engineering and Environmental Geologist) of L&MGSPL with broad experience in civil construction fields, including site investigation of land based and marine based developments, and particular expertise in large resource projects.
He has more than 30 years’ experience in resource projects including site investigation and construction of infrastructure (plant sites, heap leach facilities, roads, railways and airstrips and tailing storage facilities (TSFs)).

Involvement with TSFs covers aspects of design, construction, auditing and tailings/residue management reviews for a large number of projects covering a range of commodities including: alumina residue, bauxite residue, base metals (copper, lead and zinc), coal, gold, graphite, iron ore, manganese, nickel (sulphide and laterite), phosphate residues, rare earth residues, uranium and vanadium.
Special interests are dry stacked tailings storage facilities (DSTSF), Inpit TSFs, and Integrated waste landforms (IWL).
Chris has experience in the following overseas locations United Kingdom; Middle East (Egypt, Iran, Oman, Saudi Arabia and the United Arab Emirates); Armenia; Pakistan; Southeast Asia (Indonesia, Malaysia, Papua New Guinea, Philippines and Vietnam); West Africa (Burkina Faso, Ghana, Ivory Coast, Mali, Senegal), East Africa (Ethiopia, Tanzania) and Southern Africa (Mozambique, South Africa and the Democratic Republic of Congo); South America (Brazil, Chile, Guyana and Uruguay).
Climatic experience covers Tropical (high rainfall); Humid Savannah (high seasonal rainfall); Temperate; Semi-arid; Arid; and Hyper Arid.
L&MGSPL specialises in the execution of high level geotechnical work associated with tailings storage facilities (TSFs) and other mine infrastructure from initial site reconnaissance and assessment during exploration through study phases for development of mine projects.
Mali, West Africa
Project Manager for the Tailings Storage Strategy Study for 4 tailings streams from the Syama Project Mali. Evaluation of options for combined process streams, water recovery tailings handling (thickened and filtered) for the life of mine tailings storage.
Australia, Northern Territory
Project reviewer for the Residue Storage Facility the above ground and inpit residue streams for the Prefeasibility Study. Evaluation of options for the start-up and life of mine residue storage.
Papua New Guinea
Project Manager for the Pre-Feasibility Optimisation Study for the tailings storage facility. Review and evaluation of data and development of conceptual design. Direction of design of the containment embankment evaluation reports, technical review and client liaison.
Project Manager for the Tailings Storage Strategy Study for evaluation of options and selection of the “go forward option for the Feasibility Study for thickened tailings for the first, 27 year, mine tailings storage.
Guyana
Project Manager for the mine infrastructure plant site and tailings storage facility for the Pharsalus Project Guyana. Site visit and evaluation of borrow area for tailings storage, data review, and development of conceptual design. Direction of design of the containment embankment using insitu materials supplemented with mine waste, evaluation reports, technical review and client liaison.
Senegal, West Africa
Review of the life of mine (LOM) tailings storage facility strategy and preparation of report for input to the Canadian NI 43-101 Stock Exchange Report.
Grootegeluk Muzi, South Africa
Participation in the study and development of concept options for the design for the tailings storage facility using thickened tailings for the proposed HDPE lined Tailings Storage Facility. Review of design criteria and design documents for the final option.
Australia, Western Australia
Project Manager for evaluation and design of a heap leach facility and IWL TSF (tailings storage facility within a waste dump) and geotechnical investigation of the plant site. Preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Ghana, West Africa
Review of the life of mine (LOM) tailings storage facility strategy and preparation of report for input to the Canadian NI 43-101 Stock Exchange Report.
Australia, Western Australia
Project Manager for evaluation and design of a heap leach facility and TSF (thickened tailings). Preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Chile
Review of the prefeasibility study design for the tailings storage facility using thickened tailings for the Dominga Project (magnetite / copper) as part of the ‘gap analyses prior to the Definitive Feasibility Study.
Mali, West Africa
Project Manager for the OTSF and FTSF (oxide and flotation tailings) for Syama Project Mali. Site visit and evaluation of borrow area for tailings storage, data review, development of conceptual design and adjustments to the adjacent aerodrome design to accommodate the OTSF. Direction of design of the containment embankment using insitu materials supplemented with mine waste, evaluation reports, technical review and client liaison.
Senegal, West Africa
Project Manager for the optimisation of TSF1 for the Sabodala Project Senegal. Site visit for annual geotechnical review works, and evaluation of borrow area for tailings storage optimisation, data review, development of conceptual design and aerodrome design to accommodate TSF1. Direction of design of the containment embankment using insitu materials supplemented with mine waste, evaluation reports, technical review and client liaison.
Australia, Western Australia
Project Manager for the value engineering study of the residue storage requirements for the Kintyre Uranium Project. Data review, development of conceptual design based on the implementation of an integrated waste landform (IWL) as an alternative to the existing concept design for the residue storage facilities which resulted in significant cost savings for the project by optimising the containment embankments.
Malaysia
Project Manager for the evaluation of the residue storage requirements for the Lynas Residue Optimisation Project. Site visit and evaluation of site area for residue storage, data review, development of conceptual design based on the use of geotubes and adjustments to the existing residue storage facilities. Direction of conceptual design of the containment embankments, technical review and client liaison.
Australia, Western Australia
Project Manager for the TSF for the Valley of the Kings and Firetail tailings. Evaluation of data and design of the containment embankment using insitu colluvial materials supplemented with a geotextile filter zone. Preparation of concepts, evaluation reports, technical review and client liaison.
Saudi Arabia
Project Manager for the Stage 1 Residue Storage Facility (RSF) at the refinery site. Evaluation and design of the HDPE lined facilities (Cells 1 and 2) for the refinery waste. Preparation of concepts, evaluation reports, technical review and client liaison.
Australia, South Australia & Western Australia
Provision of input for tailings and water balance studies for various magnetite projects (Eyre Iron – South Australia, Crosslands and Extension Hill – Western Australia); and iron ore (Roy Hill, Flinders, and FMG Nyidinghu – Western Australia). Work has involved evaluation of existing concepts (start up through to closure); development of new concepts; evaluation of tailings testwork; technical review and client liaison.
Uruguay
Project Manager for evaluation of valley type TSF integrated with water storage facility constructed with segregated process plant waste. Preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Ghana, West Africa
Project Manager for evaluation of valley type TSF including preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Ivory Coast, West Africa
Project Manager for evaluation of integrated waste landform TSF including preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Project Manager for the 2015 revised design of integrated waste landform TSF including preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Democratic Republic of Congo
Project Manager for evaluation of heap leach and valley type, HDPE lined TSF for flotation tailings, access road and plant site. Preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Australia
Project Manager for evaluation of inpit tailings integrated with mine waste options (start up through to closure). Preparation of evaluation reports, technical review and client liaison.
Australia
Project Manager for evaluation of filtered tailings integrated with mine waste options (start up through to closure). Preparation of evaluation reports, technical review and client liaison.
Saudi Arabia
Project Manager for the Stage 1 Residue Storage Facility (RSF) at the refinery site. Evaluation and design of the HDPE lined facilities (Cells 1 and 2) for the refinery waste. Preparation of concepts, evaluation reports, technical review and client liaison.
Australia, Western Australia
Project Manager for evaluation of filtered tailings integrated with mine waste options including preparation of conceptual designs (start up through to closure) evaluation reports, technical review and client liaison.
Ghana, West Africa
Project Manager for evaluation of valley type TSF for flotation tailings and a double HDPE lined TSF for concentrate tailings including preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Australia, South Australia
Project Manager for IWL design (double HDPE lined) design and documentation including co-ordination of fieldwork, laboratory test work and preparation of concepts (start up through to closure); evaluation reports; technical review; presentations for regulatory authorities and public meeting; and client liaison.
Australia, South Australia
Project Manager for IWL design and documentation including co-ordination of fieldwork, laboratory test work and preparation of concepts (start up through to closure), evaluation reports, technical review and client liaison.
Australia, South Australia
Project Reviewer for existing TSFs and reviewer for TSF Scoping Study Expansion Project.
Australia, South Australia
Project Manager for IWL design and documentation including co-ordination of fieldwork; laboratory test work and preparation of concepts (start up through to closure); evaluation reports; technical review; presentations for regulatory authorities and client liaison.
Australia, South Australia
Project Manager including geotechnical investigations (boreholes and testpits) for the proposed plant site and TSF design concepts (start up through to closure) and documentation including co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.
Pakistan
Project Manager for IWL design (double HDPE lined) design and documentation including co-ordination of fieldwork, laboratory test work and preparation of concepts (start up through to closure); evaluation reports; technical review; presentations for regulatory authorities and public meeting; and client liaison.
Australia, Cape Preston WA and Newcastle
Responsibilities included Geotechnical investigations (boreholes and testpits) for the proposed plant site and TSF at the mine site south of Cape Preston; Geological reconnaissance work for the quarry site and access to the proposed port facility; Contract administration including co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison. Project Director responsible for the investigation works undertaken for the Steel Mill at Tomago near Newcastle NSW.
Australia, Newman WA
Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed 370km railway line and infrastructure at West Angelas and Cape Lambert.
Australia, Mt Magnet WA
Extensive tailings testing programme for tailings from the magnetic separation and calcine tailings circuits; Design of TSF; Liaison and site visits during construction to monitor the progress of the works; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.
Australia, Tallering Peak WA
Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed plant site at Oakajee and the 140km railway line from Oakajee to Tallering Peak; Design of TSF at Tallering Peak; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.
Australia, Newman WA
Project Manager with responsibility for Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed 10km railway line, load out facility and bridge. Organisation of all fieldwork for more than 10 cuttings along the railway alignment, laboratory test work and preparation of factual and evaluation reports. Liaison and site visits during construction to monitor the progress of the works.
Australia, Leinster WA
Project Manager for the Yakabindie Nickel Project with responsibility for: Geotechnical investigations of the plant site tailings storage and flood diversion channels including supervision of all fieldwork, laboratory testing and preparation of reports. Preparation of the Consultative Environmental Review for the project including management of sub-consultants for fauna, flora, groundwater, surface water and ethnographic studies and preparation of the final report. Liaison with Department of Mines, Environmental Protection Authority and other Government Departments, Process Consultants and clients. Design of the project tailings storage facilities.
Australia, Pannawonica WA
Project Director / Project Manager with responsibility for Extensive tailings testing programme and design of the Inpit TSF. Geotechnical investigations (boreholes and testpits) for the plant sites (PP1 and PP2). Liaison with client and Governments for tailings storage approvals. Liaison and site visits during construction to monitor the progress of the works.
Australia, Tom Price WA
Project Manager Brockman with responsibility for Fieldwork (costeans and testpits) for 46km of rail alignment. Organisation of laboratory testwork and preparation of reports.
Australia, Newman WA
Project Manager with responsibility for Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed 32km railway line, load out facility and accommodation facility. Organisation and supervision of all fieldwork for more than 20 cuttings along the railway alignment, laboratory test work and preparation of factual and evaluation reports. Liaison and site visits during construction to monitor the progress of the works.
Australia, Tom Price WA
Project Manager with responsibility for: Fieldwork for the selecting and proving of a quarry site for aggregates suitable for concrete, road sealing and ballast, investigation of a 120km rail alignment and 22km access road. Coordination and management of geotechnical team, liaison with Project Design Team, preparation of reports for all aspects of the project. Liaison and site visits during construction to monitor the progress of the works.
Australia, Paraburdoo WA
Project Manager with responsibility for: Geotechnical investigation for all major structures. Primary Crusher, Primary Stockpile, Secondary Crusher, 25km Conveyor, access roads and aggregate survey. Supervision and organisation of fieldwork (geological mapping, borehole, costean and testpit excavations). Organisation of laboratory testing and preparation of factual and evaluation reports.
Brazil
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Mauritania
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Mauritania
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ethiopia
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Pakistan
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Philippines
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Tanzania
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Tanzania
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Tanzania
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Armenia
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Armenia
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Indonesia
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Iran
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Iran
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ghana, West Africa
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ghana, West Africa
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ghana, West Africa
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Indonesia
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ghana, West Africa
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ghana, West Africa
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Ghana, West Africa
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Queensland
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Kalgoorlie WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Southern Cross WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Meekatharra WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Mt Morgans WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Mt Magnet WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Leonora WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Kambalda WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Norseman WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Norseman WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Norseman WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Leinster WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Cue WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Southern Cross WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Mt Magnet WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Halls Creek WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Cockatoo Island
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Sandstone WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Laverton WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Kalgoorlie WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Kalgoorlie WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Kalgoorlie WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Meekatharra WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Meekatharra WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Australia, Southern Cross WA
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Democratic Republic of Congo
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Namibia
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Iran
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Ghana, West Africa
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Ghana, West Africa
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Tanzania
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Northern Territory
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Karratha, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Kambalda WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Kalgoorlie, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Kalgoorlie, WA
Geotechnical advice on slope design (stability), liner design for heap leach pads and associated ponds for various heap leach projects including both permanent stacks and on/off stacks and involvement in assessment of flux leakage rates from HDPE liners.
Tanzania
Geotechnical advice on liner and underdrainage for ARD mine waste and ARD tailings storage facilities and involvement in assessment of flux leakage rates from HDPE liners.
Australia, South Australia
Geotechnical advice on liner and underdrainage for ARD mine waste and ARD tailings storage facilities and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Western Australia
Geotechnical advice on liner and underdrainage for ARD mine waste and ARD tailings storage facilities and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Western Australia
Geotechnical advice on liner and underdrainage for ARD mine waste and ARD tailings storage facilities and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Western Australia
Geotechnical advice on liner and underdrainage for ARD mine waste and ARD tailings storage facilities and involvement in assessment of flux leakage rates from HDPE liners.
Australia, Queensland
Geotechnical advice on liner and underdrainage for ARD mine waste and ARD tailings storage facilities and involvement in assessment of flux leakage rates from HDPE liners.
Mozambique, East Africa
Project Manager for the Tailings Storage Strategy Study for the TSF for the Balama Graphite Project, Mozambique. Evaluation of options for tailings streams, water recovery, tailings handling (thickened) for the initial 40 year life of this project. Direction of the design of the bituminous lined tailings storage.
Australia, Western Australia
Completion of the Pre-Feasibility Study for the Tailings Storage Facility for the McIntosh Project in the Kimberly Region of Western Australia. Evaluation of options for tailings storage for the maximum project life of 12.3 years for a bituminous lined tailings storage.
Execution of:

In-pit tailings deposition has grown in popularity for mature mining projects, new projects being developed and potential projects being studied. In-pit tailings storage facilities (IPTSFs) maximise the use of resources and offer many economic and environmental benefits. This technique is not suited to all mining sites. For sites with abandoned open pits it requires careful consideration of the geochemical characteristics of the pit, the tailings or residue, the local groundwater quality and the current and future potential end users of that groundwater. For projects with active open pits adjacent to the proposed IPTSF careful consideration of the geotechnical aspects are required given the risks involved. Within the right setting this technique does enable the available resources to be optimised to achieve the desired post closure outcomes of safe, stable structures with minimal environmental impact.
Download Inpit Tailings Storage Studies

The development of new tailings storage facilities (TSF) for mining projects, both new and existing projects, requires innovative design approaches to optimise the available resources to achieve the desired outcomes of safe stable structures with minimal environmental impact. The use of integrated waste landforms and in-pit tailings storage facilities maximises the use of resources and offers many economic and environmental benefits in achieving the desired outcomes. From a tailings management perspective the IWL can be simply defined as a tailings storage facility (TSF) that is located inside the waste rock storage. It is formed by placing controlled, compacted, earthworks against the mine waste to form a containment embankment to retain the tailings. Mine waste is placed around the outer edge of this compacted containment embankment such that a void, or storage area, is formed within the waste rock storage. This void allows for further controlled, compacted, earthworks to be placed around the circumference of the void to form a perimeter containment boundary between the tailings and the mine waste.
One of the advantages of this structure is that continued staged construction is in the downstream direction, that is, each lift is laid back against the surrounding mine waste rock storage and is placed over previously placed mine waste. Construction of future embankment lifts therefore does not rely on the strength of the deposited tailings and, as such, the rate of rise and strength of the tailings does not impact on construction considerations.
Dry stacking is the terminology which describes the placement of tailings which has been thickened to a slurry density of 65% - 70% solids by weight before being filtered/screened to 80% - 90% solids by weight to further reduce the volume of liquor prior to transportation and placement of the tailings. The tailings are transported by conveyor or truck from the filter/screening plant and then placed, spread and compacted to form an unsaturated, dense and stable tailings ‘stack’. Dry stacking of tailings has been adopted where: