Experience

Tailings Storage Facility (TSF) Specialist

Experience

  • Filter projects by commodity:

  • Filter projects by country:

  • Filter projects by climatic regime:

Commodity: Lithium

Leo Lithium (formerly Mali Lithium) Goulamina Lithium

Project Geotechnical Consultant for revised Goulamina Project Tailings Storage Facility (TSF), for the proposed 80 to 200 Mt Project for thickened (50% solids wet tailings stream) for the initial 20-year life of project.

Country:
Mali

Climatic:
Humid Savannah

Commodity: Phosphate

Ammaroo Phosphate Residue Facilities

Project reviewer for the Residue Storage Facility the above ground and inpit residue streams for the Prefeasibility Study. Evaluation of options for the start-up and life of mine residue storage.

Country:
Australia

Climatic:
Semi Arid

Commodity: Nickel

WMC Resources Ltd, Kambalda Nickel Operations

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Australia

Climatic:
Semi Arid

Commodity: Nickel

Bulong Nickel

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Australia

Climatic:
Semi Arid

Commodity: Nickel

Yakabindie Nickel Project

Project Manager for the Yakabindie Nickel Project with responsibility for: Geotechnical investigations of the plant site tailings storage and flood diversion channels including supervision of all fieldwork, laboratory testing and preparation of reports. Preparation of the Consultative Environmental Review for the project including management of sub-consultants for fauna, flora, groundwater, surface water and ethnographic studies and preparation of the final report. Liaison with Department of Mines, Environmental Protection Authority and other Government Departments, Process Consultants and clients. Design of the project tailings storage facilities.

Country:
Australia

Climatic:
Semi Arid

Commodity: Iron Ore

El Aouj Iron Ore Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Mauritania

Climatic:
Hyper Arid

Commodity: Iron Ore

Askaf Iron Ore Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Mauritania

Climatic:
Hyper Arid

Commodity: Iron Ore

Minas Rio Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Brazil

Climatic:
Tropical

Commodity: Iron Ore

Brockman Iron Ore Project

Project Manager Brockman with responsibility for Fieldwork (costeans and testpits) for 46km of rail alignment. Organisation of laboratory testwork and preparation of reports.

Country:
Australia

Climatic:
Semi Arid

Commodity: Iron Ore

Midwest Iron and Steel Project

Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed plant site at Oakajee and the 140km railway line from Oakajee to Tallering Peak; Design of TSF at Tallering Peak; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.

Country:
Australia

Climatic:
Semi Arid