Project Geotechnical Consultant for revised Goulamina Project Tailings Storage Facility (TSF), for the proposed 80 to 200 Mt Project for thickened (50% solids wet tailings stream) for the initial 20-year life of project.
Experience
Experience
Tailings Storage Facility (TSF) Specialist
Experience
Commodity: Phosphate
Ammaroo Phosphate Residue Facilities
Project reviewer for the Residue Storage Facility the above ground and inpit residue streams for the Prefeasibility Study. Evaluation of options for the start-up and life of mine residue storage.
Country:
Australia
Climatic:
Semi Arid
Commodity: Nickel
WMC Resources Ltd, Kambalda Nickel Operations
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Australia
Climatic:
Semi Arid
Commodity: Nickel
Bulong Nickel
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Australia
Climatic:
Semi Arid
Commodity: Nickel
Yakabindie Nickel Project
Project Manager for the Yakabindie Nickel Project with responsibility for: Geotechnical investigations of the plant site tailings storage and flood diversion channels including supervision of all fieldwork, laboratory testing and preparation of reports. Preparation of the Consultative Environmental Review for the project including management of sub-consultants for fauna, flora, groundwater, surface water and ethnographic studies and preparation of the final report. Liaison with Department of Mines, Environmental Protection Authority and other Government Departments, Process Consultants and clients. Design of the project tailings storage facilities.
Country:
Australia
Climatic:
Semi Arid
Commodity: Iron Ore
El Aouj Iron Ore Project
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Mauritania
Climatic:
Hyper Arid
Commodity: Iron Ore
Askaf Iron Ore Project
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Mauritania
Climatic:
Hyper Arid
Commodity: Iron Ore
Minas Rio Project
Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.
Country:
Brazil
Climatic:
Tropical
Commodity: Iron Ore
Brockman Iron Ore Project
Project Manager Brockman with responsibility for Fieldwork (costeans and testpits) for 46km of rail alignment. Organisation of laboratory testwork and preparation of reports.
Country:
Australia
Climatic:
Semi Arid
Commodity: Iron Ore
Midwest Iron and Steel Project
Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed plant site at Oakajee and the 140km railway line from Oakajee to Tallering Peak; Design of TSF at Tallering Peak; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.