Experience

Tailings Storage Facility (TSF) Specialist

Experience

  • Filter projects by commodity:

  • Filter projects by country:

  • Filter projects by climatic regime:

Commodity: PGM

Julimar PGM Project

Project Geotechnical Consultant, Scoping Study Tailings Storage Facility (TSF), for the proposed300 Mt Project. Geotechnical tailings testing and examination of options for TSF location for the proposed 20-year mine life.

Country:
Australia

Climatic:
Temperate

Commodity: Copper

Olympic Dam TSFs – BHP Billiton Olympic Dam

Project Reviewer for existing TSFs and reviewer for TSF Scoping Study Expansion Project.

Country:
Australia

Climatic:
Arid

Commodity: Copper

Dominga Tailings Storage Facility

Review of the prefeasibility study design for the tailings storage facility using thickened tailings for the Dominga Project (magnetite / copper) as part of the ‘gap analyses prior to the Definitive Feasibility Study.

Country:
Chile

Climatic:
Hyper Arid

Commodity: Vanadium

Windimurra Vanadium Project – Mt Magnet WA

Extensive tailings testing programme for tailings from the magnetic separation and calcine tailings circuits; Design of TSF; Liaison and site visits during construction to monitor the progress of the works; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.

Country:
Australia

Climatic:
Semi Arid

Commodity: Vanadium

Windimurra Vanadium Project

Project reviewer for the Tailings Storage Facility designed by others. Gaps in the design identified and recommendations provided for improvements to the design. Scoping study for redesign of the TSFs.

Country:
Australia

Climatic:
Semi Arid

Commodity: Uranium

Kintyre Uranium Project

Project Manager for the value engineering study of the residue storage requirements for the Kintyre Uranium Project. Data review, development of conceptual design based on the implementation of an integrated waste landform (IWL) as an alternative to the existing concept design for the residue storage facilities which resulted in significant cost savings for the project by optimising the containment embankments.

Country:
Australia

Climatic:
Arid

Commodity: Rare Earth

Peak Resources Ngualla Rare Earths Project

Project reviewer for the DFS Tailings Storage Facility designed by others. Gaps in the design identified and recommendations provided for improvements to the design.

Country:
Tanzania

Climatic:
Humid Savannah

Commodity: Rare Earth

Lynas Residue Storage Facilities

Project Manager for the evaluation of the residue storage requirements for the Lynas Residue Optimisation Project. Site visit and evaluation of site area for residue storage, data review, development of conceptual design based on the use of geotubes and adjustments to the existing residue storage facilities. Direction of conceptual design of the containment embankments, technical review and client liaison.

Country:
Malasya

Climatic:
Tropical

Commodity: Lithium

Manono Lithium Tin Project

Project Geotechnical Consultant to AVZ Minerals Limited for their Tailings Storage Facility (TSF) which at this stage is a wet TSF supplemented with an in-pit TSF. Evaluation of the project site preparation of the preliminary concepts followed by detailed design for the 30-year life of project. Training of site geologists to undertake the required geotechnical investigation works as part of the TSF design.

Country:
Democratic Republic of Congo

Climatic:
Tropical

Commodity: Lithium

Infinity Lithium

Project Geotechnical Consultant to Infinity Lithium Corporation for their proposed Dry Stacked Tailings Storage Facility (DSTSF). Evaluation of Scoping Study prepared by others and preparation of PFS dry stacking design for the 30-year life of project.

Country:
Spain

Climatic:
Temperate