Experience

Tailings Storage Facility (TSF) Specialist

Experience

  • Filter projects by commodity:

  • Filter projects by country:

  • Filter projects by climatic regime:

Commodity: Iron Ore

Midwest Iron and Steel Project

Geotechnical investigations (geological mapping boreholes, costeans and testpits) for the proposed plant site at Oakajee and the 140km railway line from Oakajee to Tallering Peak; Design of TSF at Tallering Peak; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.


Commodity: Iron Ore

Minas Rio Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Copper

Mt Chalmers Project (Rockhampton., Queensland)

Project Geotechnical Consultant for the Prefeasibility Study for a valley-style TSF. Geotechnical tailings testing, to optimise the TSF from project start-up to closure.


Commodity: Gold

MT Dimer

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Gold

Mt Muro Gold Project

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Gold

Mt Pleasant

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Gold

Mungari Project, Western Australia


Commodity: Gold

Newcrest – Telfer

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.


Commodity: Gold

Nobles Nob Gold Project (Tennant Creek, Northern Territory)

Project Geotechnical Consultant to Wave International and Tennant Mining for their proposed Dry Stacked Tailings Storage Facility (DSTSF) for the Nobles Nob Gold Project. Geotechnical tailings testing and evaluation, followed by preparation of a preliminary stability analysis and preparation of recommendations on dry stacking of tailings.