DFS for tailings storage facilities TSF1, TSF2, Sabodala In-Pit TSF as an alternative to TSF2, BIOX TSF (double HDPE-lined with underdrainage, leak detection between the liners and leak detection under the base liner).
Senegal, West Africa
Experience
Tailings Storage Facility (TSF) Specialist
Experience
Commodity: Gold
Sabodala Tailings Storage Facility
Project Manager for the optimisation of TSF1 for the Sabodala Project Senegal. Site visit for annual geotechnical review works, and evaluation of borrow area for tailings storage optimisation, data review, development of conceptual design and aerodrome design to accommodate TSF1. Direction of design of the containment embankment using insitu materials supplemented with mine waste, evaluation reports, technical review and client liaison.
Country:
Senegal
Climatic:
Tropical
Commodity: Gold
TSF Strategy Study Sabodala Mine
Review of the life of mine (LOM) tailings storage facility strategy and preparation of the PFS Report for input to the Canadian NI 43-101 Stock Exchange Report.
Country:
Senegal
Climatic:
Humid Savannah
Commodity: Gold
Toro Gold Limited Mako Gold Project
Project reviewer for the DFS Tailings Storage Facility designed by others. Gaps in the design identified and recommendations provided for improvements to the design. Independent review of TSF construction.