Commodity: Mineral Sands

Goshen Mineral Sands Project, Victoria

Review of the proposed in-pit tailings storage system. This review resulted in tailings testwork to assess the tailings properties. This project is yet to be completed

Country:
Australia

Climatic:
Temperate

Commodity: PGM

Julimar PGM Project

Project Geotechnical Consultant, Scoping Study Tailings Storage Facility (TSF), for the proposed300 Mt Project. Geotechnical tailings testing and examination of options for TSF location for the proposed 20-year mine life.

Country:
Australia

Climatic:
Temperate

Commodity: Copper

Olympic Dam TSFs – BHP Billiton Olympic Dam

Project Reviewer for existing TSFs and reviewer for TSF Scoping Study Expansion Project.

Country:
Australia

Climatic:
Arid

Commodity: Vanadium

Windimurra Vanadium Project – Mt Magnet WA

Extensive tailings testing programme for tailings from the magnetic separation and calcine tailings circuits; Design of TSF; Liaison and site visits during construction to monitor the progress of the works; Co-ordination of fieldwork, laboratory test work and preparation of factual and evaluation reports, technical review and client liaison.

Country:
Australia

Climatic:
Semi Arid

Commodity: Vanadium

Windimurra Vanadium Project

Project reviewer for the Tailings Storage Facility designed by others. Gaps in the design identified and recommendations provided for improvements to the design. Scoping study for redesign of the TSFs.

Country:
Australia

Climatic:
Semi Arid

Commodity: Uranium

Kintyre Uranium Project

Project Manager for the value engineering study of the residue storage requirements for the Kintyre Uranium Project. Data review, development of conceptual design based on the implementation of an integrated waste landform (IWL) as an alternative to the existing concept design for the residue storage facilities which resulted in significant cost savings for the project by optimising the containment embankments.

Country:
Australia

Climatic:
Arid

Commodity: Phosphate

Ammaroo Phosphate Residue Facilities

Project reviewer for the Residue Storage Facility the above ground and inpit residue streams for the Prefeasibility Study. Evaluation of options for the start-up and life of mine residue storage.

Country:
Australia

Climatic:
Semi Arid

Commodity: Nickel

WMC Resources Ltd, Kambalda Nickel Operations

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Australia

Climatic:
Semi Arid

Commodity: Nickel

Bulong Nickel

Advice on design concepts (start up through to closure), operation, audits, inspections, management reviews, advice on seepage, stability, tailings deposition, water recovery and preparation of tailings disposal strategy plans.

Country:
Australia

Climatic:
Semi Arid

Commodity: Nickel

Yakabindie Nickel Project

Project Manager for the Yakabindie Nickel Project with responsibility for: Geotechnical investigations of the plant site tailings storage and flood diversion channels including supervision of all fieldwork, laboratory testing and preparation of reports. Preparation of the Consultative Environmental Review for the project including management of sub-consultants for fauna, flora, groundwater, surface water and ethnographic studies and preparation of the final report. Liaison with Department of Mines, Environmental Protection Authority and other Government Departments, Process Consultants and clients. Design of the project tailings storage facilities.

Country:
Australia

Climatic:
Semi Arid