Review of the prefeasibility study design for the tailings storage facility using thickened tailings for the Dominga Project (magnetite / copper) as part of the ‘gap analyses prior to the Definitive Feasibility Study.
Review of the prefeasibility study design for the tailings storage facility using thickened tailings for the Dominga Project (magnetite / copper) as part of the ‘gap analyses prior to the Definitive Feasibility Study.